Skip to product information
REST® Evercool®+ Cooling Pillowcases King - 2 Pillowcases for Sensitive Skin, Silver Infused Fabric for Hygienic Sleep, Silky Smooth for Curly Hair, High Elastic for Snug Fit (19x35 inches)
$102.79
Shipping calculated at checkout.
About This
- Instant Cooling: Experience sleeping on the cold side of the pillow with Rest’s advanced cooling pillowcases; Wake up refreshed and rejuvenated with cutting-edge performance fabric that offers instant and long-lasting cooling sensation; Evercool pillowcases are ideal for all seasons and hot sleepers with night sweats, hot flashes
- Luxuriously Soft and Smooth: Science-backed fabric innovation that’s softer, smoother and stronger than silk; Glides effortlessly against your skin for frictionless sleep and prevent crush wrinkles caused by side sleeping; Elevate your sleep with unbelievable comfort
- Always a Good Hair Day: Reduce friction, prevent frizz and hair damage with Evercool’s ultra-fine, super smooth fabric; Curly and wavy hair approved with our anti-static cooling pillowcases that don’t pull or tug; Don’t wake up tired or with messy hair ever again
- Self-Cleaning Fabric Tech: Lasting hygienic pillowcases for sensitive skins. With Noble's Ionic+ extruded silver yarn technology, positively charged silver ions are permanently embedded into Evercool+ fiber; The pillow case is self-cleaning to effectively inhibit and eliminate odor
- Stain Resistant: Resistant to oil absorption; The pillowcases will always look and feel brand new, without stains or color fading; Plus, you can rest assure any skin care products will stay where they belong, and you can look and feel your best
Overview
- Size : King (2 pcs)
- Material : Evercool+ Performance Fabric
- Brand : REST
- Color : Lavender Breeze
- Product Care Instructions : Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/no heat or line dry. 2) Don't use iron. 3) Don't dry clean. Washing: 1) Wash on low with a low alkaline or neutral Ph detergent. 2) Cold water and low spin. 3) Don't bleach. 4) Don't use fabric softener. Drying: 1) Tumble dry on low/n… See more
Details
This product is crafted with quality materials to ensure durability and performance. Designed with your convenience in mind, it seamlessly fits into your everyday life.
Shipping & Returns
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.
We are committed to ensuring a positive shopping experience for all our customers. If for any reason you wish to return an item, we invite you to reach out to our team for assistance, and we will evaluate every return request with care and consideration.
Shop The Full Collection